Home / Factory Tour

Walk our floor before you place the order

Every battery we ship starts in this 20,000m² plant in Zhumadian, Henan — backed by our Shenzhen R&D center. Follow the same route we walk with visiting buyers: from incoming cell inspection to the loading dock.

20,000m²
Production base, Henan
¥250M
Total plant investment
200+
Employees · 20+ R&D engineers
≤0.3%
Field defect rate
THE TOUR ROUTE

Seven stops, in the exact order your battery is built

This is the same path a cell takes through the plant — and the same route we walk with auditors and visiting buyers.

01
Incoming inspection

A-grade CATL / EVE / CALB cells verified on arrival

02
Cell sorting & matching

Capacity & internal-resistance matched packs

03
Assembly line

Laser welding, semi-automated pack assembly

04
BMS integration

Protection board fitting & firmware flashing

05
Aging & testing

100% full charge-discharge cycle test

06
Final QC

OQC audit against your spec sheet

07
Packing & dispatch

UN-certified cartons, export documentation

STOP 01–02
factory 01 - Factory Tour
MATERIALS IN

Every cell earns its way onto the line

Batches of A-grade LiFePO4 cells from CATL, EVE and CALB are sampled and verified before they touch production. Cells are then sorted and matched by capacity and internal resistance — the single biggest factor in pack longevity.

IQC sampling on every incoming batch, with supplier lot traceability

Automatic cell sorting to ±5mV voltage and tight IR bands

Rejected cells never enter the production flow

ASSEMBLY

Laser welding, in a dust-controlled workshop

Packs are assembled in clean, temperature-regulated zones with clearly separated production lines. Laser welding replaces manual soldering on busbars for consistent, low-resistance joints, and every BMS is flashed and verified in-line.

Dust-controlled, temperature-regulated assembly zones

Laser-welded busbar connections on every pack

BMS firmware flashed and parameter-checked before sealing

STOP 03–04
factory 03 - Factory Tour
STOP 05–06
factory 05 - Factory Tour
TESTING

100% tested. Not sampled — every single unit

Each finished pack runs a full charge-discharge aging cycle on dedicated test racks before it can leave the building. Final QC then audits every unit against the customer spec sheet — the discipline behind our sub-0.3% field defect rate.

Full-cycle aging test on 100% of production, not batch sampling

Capacity, IR, BMS protection triggers verified per unit

Test reports available with every OEM shipment

DISPATCH

Packed for a 10,000km journey

Finished batteries ship in UN-certified cartons with full export documentation — UN38.3, MSDS and sea/air freight paperwork handled by our own trade team. About 85% of production exports directly to overseas B2B partners.

UN-certified packaging, drop-tested carton design

UN38.3 / MSDS documentation prepared in-house

Consolidated sea, air and rail freight options

STOP 07
factory 07 - Factory Tour
AROUND THE PLANT

No showroom staging — this is the working floor

Front factory 1 - Factory Tour

Plant exterior — Zhumadian, Henan

factory 02 - Factory Tour

Assembly workshop

factory 06 - Factory Tour

Production line

factory 04 - Factory Tour

Testing area

08 - Factory Tour

Workshop detail

010 - Factory Tour
Process equipment
012 - Factory Tour

Production zone

013 - Factory Tour
Factory floor
0f266ca840fd9a3563a244fab6e367d6 1024x768 1 - Factory Tour
- Factory Tour
THE SHOWROOM

See the full product range in one room

The on-site showroom holds our complete lineup — 12V/24V drop-in packs, 51.2V rack and wall systems, stackable towers and all-in-one ESS units — plus OEM samples we’ve built for partner brands. It’s the fastest way to compare enclosures, finishes and build quality in person.
12V / 24V packs Rack & wall 51.2V Stackable towers All-in-One ESS OEM samples
E8AF81E4B9A6E59088E99B86 1024x867 1 - Factory Tour
AUDITED & CERTIFIED

Certifications you can verify, not just read about

Every certificate below is available as a PDF on request, with registration numbers you can check against the issuing body. Third-party factory audits welcome.

CE

EU conformity

FCC

US EMC compliance

UN38.3

Transport safety

CB Scheme

IEC international

RoHS

Hazardous substances

IEC 62619 · ISO 9001

Cell safety · QMS

Tour the factory this week — no flight required

Most of our OEM partners audit us by live video first. An engineer walks the floor with a camera, follows the route above, and answers questions in real time. In-person visits to the Henan plant and Shenzhen office are always welcome.

Live video tour — within 48 hours

Zoom / WhatsApp / Teams. 30–45 minutes, your questions answered by an engineer on the floor.

Visit in person

Production base: Zhumadian, Henan Province · R&D and trade office: Guangming District, Shenzhen.

Third-party audits welcome

SGS, TÜV, BV or your own QC team — we host buyer audits year-round.

Get a Custom Quote in 24 Hours !

Engineers respond within 1 business day.

Inquiry Form